S28 ECO
- Our standard deposit structure.
- 25% at the order and design (O&D) appointment.
- 25% in 60 days from the O&D appointment.
- 25% in 90 days from the O&D appointment.
- Final 25% in 120-159 days from the O&D appointment, payable at the time of the final pre-delivery inspection, usually 2 weeks prior delivery.
- Total price includes standard specs, such as split heat pump rated for -30 degrees, premium Ontario standard insulation package and biometric entry door lock system.
- Please look at the standard features list for a complete list of inclusions.
- Furniture not included (Unless specified).